Cost estimate

Construction cost, item by item, with its source.

Enter the floor areas and the structure system and get a first budget (≈) with the items of a 37-phase template from permit to occupancy; when the model arrives the quantities are replaced by the IFC take-off. Prices come from your own list or a sourced market average; VAT, contingency, overhead and profit are separate lines in the total.

Constructio cost table: items with quantity, unit price and amount; forecast and actual
Päris ekraan · näidismudel

Where the quantity comes from

Two ways, joined in the same items:

  • Preliminary estimate: rough ratios (≈) from floor areas, basement, structure, heating and roof answers — every item explains “Where does this quantity come from?”
  • Model: the IFC take-off is written to the item's forecast and stays traceable to its elements
  • A quantity you correct by hand is never overwritten by a recalculation

Where the price comes from

Unit prices are never made up. Your own price library first; otherwise a dated market average (≈, VAT excluded) built from 2–3+ public sources per item, with the sources shown on the item. An item without a source comes in empty, with the reason. Prices move to the current month with the construction cost index.

Forecast and actual

The cost table is the forecast; purchases in the work plan and approved progress payments are the actual. Both sit side by side on the same items; leave an item out of the total without deleting it to see what the total would be without it.

Constructio cost item: where the quantity comes from — IFC file, quantity storey by storey, rule and elements
Päris ekraan · näidismudel

Hea teada

  • A preliminary estimate is not an engineering calculation; correct the quantities when the structural design and the final take-off arrive.
  • Market averages are averages of listings and catalogues, not quotes. Price lists exist today for Turkey (TRY) and Estonia (EUR).

Korduma kippuvad küsimused

Can I estimate without a model?

Yes. Enter the floor areas and building details; the template items are set up with preliminary quantities (≈). When the model arrives the quantities change to the take-off.

Can I export to Excel?

Yes; the cost table downloads as Excel and can be imported again.

Is VAT included?

Unit prices exclude VAT; the total adds VAT, contingency, overhead and profit and escalation as separate lines you can change in the project settings.

Can I try it for free?

The Free plan covers one project for 30 days, no card needed.

Proovige oma esimeses projektis.

Vaadake, mida tasuta pakett hõlmab; valige ehitusmeeskonnale Litsents, joonistele Pro ja DWG-joonistele AI Pro.

Tasuta €0 · 30 päeva Litsents €19 kuus Pro €30 kuus AI Pro €50 kuus Ettevõte Võtke meiega ühendust

Inglise, türgi, eesti, saksa ja hispaania keel, hele ja tume teema. Iga meeskonnaliige kasutab, mida eelistab.